Access to clean and reliable water remains a challenge in many parts of Kenya, making borehole drilling an essential solution for households, farms, and businesses. Whether for domestic use, irrigation, or commercial purposes, a well-drilled borehole provides a sustainable water supply.

In this blog, we’ll take you through the step-by-step process of borehole drilling in Kenya, from site assessment to water extraction, ensuring you understand what to expect before, during, and after drilling.

Step 1: Site Assessment & Hydrogeological Survey

Before drilling begins, a hydrogeological survey is conducted to determine the best location for the borehole. This involves:

  • Geophysical Survey – Using electrical resistivity or electromagnetic methods to detect underground water.
  • Geological Analysis – Studying rock formations and water table depth.
  • Water Potential Estimation – Predicting the borehole’s yield (liters per hour).

Why is this important? A proper survey minimizes the risk of drilling a dry or low-yield borehole.

Step 2: Obtaining Permits & Legal Compliance

In Kenya, borehole drilling is regulated by the Water Resources Authority (WRA). Required steps include:

  • Water Permit Application – Submit through WRA (takes 2–4 weeks).
  • Environmental Impact Assessment (EIA) – Needed for large-scale projects (regulated by NEMA).
  • Local Authority Approval – Some counties require additional permits.

Note: Drilling without a permit is illegal and may lead to fines or borehole closure.

Step 3: Drilling the Borehole

Once permits are secured, the actual drilling begins. The process includes:

a) Rig Mobilization
  • Heavy-duty drilling equipment is transported to the site.
  • Common drilling methods in Kenya:
    • Rotary Drilling (for soft to medium-hard rock).
    • Percussion Drilling (for hard rock formations).
b) Drilling & Casing Installation
  • The borehole is drilled to the required depth (typically 50m–200m).
  • Steel or PVC casing is installed to prevent collapse and block contaminants.
  • screen is fitted at the aquifer level to allow water in while filtering sand.
c) Borehole Development
  • The borehole is flushed to remove drilling debris.
  • Airlifting or surging techniques improve water flow.
Step 4: Pump Installation & Yield Testing

After drilling, the next steps are:

a) Yield Test (Pumping Test)
  • Determines the borehole’s sustainable water output (measured in liters per hour).
  • Helps select the right pump size.
b) Water Quality Testing
  • Lab tests check for contaminants (fluoride, bacteria, heavy metals).
  • Ensures water is safe for drinking or irrigation.
c) Pump Installation
  • Submersible pumps (common for deep boreholes).
  • Solar pumps (ideal for off-grid areas).

Step 5: Final Approval & Handover
  • WRA Inspection – Some boreholes require final approval.
  • Completion Report – Includes drilling log, yield test results, and water quality analysis.
  • Handover – The client receives full documentation and maintenance guidelines.

How Long Does Borehole Drilling Take in Kenya?
  • Survey & Permits: 2–6 weeks
  • Drilling & Casing: 2–7 days (depending on depth & geology)
  • Pump Installation & Testing: 1–3 days
  • Total Time: 3–8 weeks (varies by location and bureaucracy)

Common Challenges in Borehole Drilling
  1. Dry or Low-Yield Boreholes – Due to poor site assessment.
  2. Collapsed Boreholes – If casing is not properly installed.
  3. Salty or Contaminated Water – Requires treatment systems.
  4. Delays in Permits – Can prolong the project.

Conclusion

Borehole drilling in Kenya is a structured process that requires proper planning, professional execution, and compliance with legal requirements. By following these steps—conducting a hydrogeological survey, obtaining permits, hiring a reputable driller, and performing water tests—you can secure a reliable water source for years to come.

Need help drilling a borehole? Consult with Topmast engineering ensure a smooth and successful project.